Waterproof long lead

Waterproof long lead

15m
£40.00
Skip to product information
Waterproof long lead

Waterproof long lead

£40.00
Size

The Waterproof Long Lead from Apparel by Unleashed is a durable training lead designed for recall work, distance training, and controlled freedom in the field. Built to handle wet and muddy conditions without absorbing water or becoming heavy and stiff – easy to clean, quick to dry, and reliable session after session.

Key Features

  • Waterproof Construction – won’t absorb water, mud, or dirt
  • Carabiner Clip – secure, reliable attachment that won’t accidentally unclip
  • Easy to Clean – simply wipe down or rinse after use
  • Quick-Dry – ready for the next session fast
  • Durable Build – designed for repeated field and training use
  • Lightweight & Easy to Handle – won’t tangle or drag in wet conditions
  • By Apparel by Unleashed – trusted name in practical dog training equipment

Perfect For

  • Recall and distance training in wet or muddy conditions
  • Gundog training and fieldwork
  • Water work and damp ground environments
  • Everyday training where a standard lead gets waterlogged

You may also like