Skip to product information
Waterproof long lead
£40.00
The Waterproof Long Lead from Apparel by Unleashed is a durable training lead designed for recall work, distance training, and controlled freedom in the field. Built to handle wet and muddy conditions without absorbing water or becoming heavy and stiff – easy to clean, quick to dry, and reliable session after session.
Key Features
- Waterproof Construction – won’t absorb water, mud, or dirt
- Carabiner Clip – secure, reliable attachment that won’t accidentally unclip
- Easy to Clean – simply wipe down or rinse after use
- Quick-Dry – ready for the next session fast
- Durable Build – designed for repeated field and training use
- Lightweight & Easy to Handle – won’t tangle or drag in wet conditions
- By Apparel by Unleashed – trusted name in practical dog training equipment
Perfect For
- Recall and distance training in wet or muddy conditions
- Gundog training and fieldwork
- Water work and damp ground environments
- Everyday training where a standard lead gets waterlogged